PS-025 Theme: Predictive Maintenance & Asset Reliability

Predictive Tool-Life Monitoring and Optimization System

Problem Overview

Cutting tools do not always achieve their expected life, leading to premature replacement, unplanned tool failure, quality variation and increased tooling cost. Fixed tool-change rules may not account for actual cutting conditions. The challenge is to develop a data-driven tool-life monitoring system that uses machining parameters and tool-condition signals to estimate remaining useful life and recommend an appropriate replacement point.

Industrial Context & Background

Predictive Maintenance / AI-ML / Machining Analytics

Technical Requirements

1) Capture selected machining/tool parameters
2) Support selected tool-operation pilot
3) Configurable tool-life limits
4) Provide warning before predicted failure
5) Maintain tool/machine/part history
6) Allow model improvement from new data

Suggested Technology Stack: Machine Learning; CNC/PLC Data; Vibration/Current/Acoustic Sensors; Edge Analytics; Dashboard

Expected Solution & Prototype

1) Actual vs predicted tool life error quantified
2) Remaining useful life estimation accuracy measured
3) Premature tool-change and unexpected-failure events tracked
4) Tool life in components/cutting time automatically recorded
5) Tool cost per component compared with baseline
6) Quality/rejection trend correlated with tool condition

Team Selection

Register or log in with your team leader account to select this problem statement.

Log In to Select Register Team
Reference Materials
Round 1 Idea Template